Get In Touch
Suite 3 52 Upton Lane, London, United Kingdom, E7 9LN,
info@invotyx.com
Ph: +44 07958 137157
Back

Dead Leg Management Program

What is Dead Leg Management Program?

DLMP

Dead legs are stagnant sections in piping systems that pose significant risks due to corrosion, contamination, and microbial growth. Effective
management ensures operational safety, asset integrity, and compliance with industry standards. It helps prevent unexpected failures,
environmental hazards, and costly shutdowns. Dead leg management program need to developed and updated.

Our Services

Dead leg Identification (Operational and Permanent),
Mapping and Markup on P&IDs

Dead Leg Inspection Plan and Mitigation Strategies

Dead Leg Register Preparation and Revision

Dead leg Risk Assessment based

Key Benefits of DLMP

Transform your inspection strategy with data-driven insights that enhance safety, reduce costs, and optimize operations.

Prevents corrosion and microbial growth in stagnant zones, extending
equipment life

Reduces risk of leaks, contamination, and potential failures that could
impact personnel and operations

Minimizes unplanned shutdowns and maintenance costs through
proactive monitoring and mitigation.

Decrease Maintenance and operational cost of asset

DLMP Deliverables

Dead Leg Register

Comprehensive listing of all identified dead legs across the facility.

Risk Assessment Report

Evaluation of corrosion risk, microbial activity, and failure probability.

Inspection Strategy Document

Tailored inspection plans based on risk levels and asset criticality.

Mitigation Plan

Recommendations for flushing, redesign, or removal of dead legs.

Monitoring Schedule

Routine inspection and sampling schedule to track condition over time.

Dead Leg Management Dashboard

Visual tool for tracking status, actions, and performance metrics.

Requirements

During Design Phase

to minimize dead legs through optimized piping layouts.

Post-Inspection Findings

when corrosion or microbial activity is detected in stagnant zones.

Before Life Extension Projects

to assess and mitigate risks in aging infrastructure.

This website stores cookies on your computer. Cookie Policy